The cooperatives have long been familiar with the benefits of hydropower. From their very inception, they depended on hydropower from federal hydropower projects to supply energy to their members.

The cooperatives completed the first of three hydropower plants on the Arkansas River in one of their most ambitious generation projects ever in December 1988. The plant, the Clyde T. Ellis Hydroelectric Generating Station, was built at the James W. Trimble Lock and Dam near Fort Smith. It marked the cooperatives’ commitment to a long-term, low-cost power source for their members. Later in the 1980s and 90s, the cooperatives completed two other hydropower plants, making the total investment in the hydropower energy resources at more than $330 million.

In addition to its owned generation assets, Arkansas Electric Cooperative Corporation (AECC) utilizes purchased power agreements for several additional energy resources. AECC purchases approximately 193 megawatts of hydroelectric energy from the Southwestern Power Administration and four megawatts of biomass energy from the EcoVista landfill. AECC has also entered into 20 to 25-year purchased power agreements for about 474 megawatts of wind energy and has contracted to receive up to 27 megawatts of solar energy.

Altogether, the total amount of these resources is approximately 793 megawatts, which represents more than 20% of the cooperative’s generation energy portfolio.

Energy Efficiency

AECC is also committed to promoting the efficient use of electricity to meet the growing energy load requirements of its members. While energy efficiency alone will not eliminate the need to invest in additional generation resources, it does have unique benefits beyond lowering a member’s electric bill. The efficient use of energy exemplifies individual action accruing to the benefit of both the individual and the broader community, which is a defining characteristic of the cooperative business model. To maximize the potential of system-wide energy efficiency efforts, AECC is dedicated to on-going efforts to identify best practices, educate members about energy efficiency programs and determine actionable innovations for future implementation.

Future Action

Throughout its history, AECC’s leaders have made tough choices and taken bold positions to ensure that the cooperative could meet its members’ power needs. Today, those leadership principles are more important than ever. The cooperative will continue to make decisions and take a stand to support efforts for energy policies that are fair and in the best interest of electric cooperative members.

Looking to the future, AECC will continue to maximize the value of existing generation resources, invest in new technologies, and maintain a diverse mix of energy sources.


Hydroelectric

The Electric Cooperatives of Arkansas completed the first of three hydropower plants on the Arkansas River in one of their most ambitious generation projects ever in December of 1988. The plant was dedicated on April 24, 1989.

The plant, the Clyde T. Ellis Hydroelectric Generating Station, was built at the James W. Trimble Lock and Dam near Fort Smith. It marked the cooperatives’ commitment to a long-term, low-cost power source for their members, as well as their dedication to environmentally friendly power, long before it was fashionable to do so. Later in the 1980s and 90s, the cooperatives completed two other hydropower plants, making the total investment in hydropower energy resources at about $330 million.

Although AECC didn’t begin building hydropower plants until the 1980s, the cooperatives had long been familiar with the benefits of hydropower. From their very inception, they depended on hydropower from federal dams to serve their members. In fact, without hydropower, it could be argued that the cooperatives might not have been able to survive.

AECC’s Hydroelectric Generating Stations

One of AECC's hydroelectric generating stations One of AECC's hydroelectric generating stations One of AECC's hydroelectric generating stations

Hydropower History

Two years before President Franklin D. Roosevelt’s signing in 1935 of the Rural Electrification Act, which created the Rural Electrification Administration (REA) and provided funding for the development of cooperatives across the country, he signed the Tennessee Valley Authority Act of 1933. This law laid the first cornerstone for the formation of the electric cooperatives by providing a vital building block for the program – access to hydropower from the federal government’s dams.

Publicly owned utilities first got access to the power in 1902 with the passage of the Reclamation Act, which was designed to spur growth in the West by reclaiming the arid region through the construction of dams to divert and store the available water. With the 1933 law, cooperatives were added to the “preference” list, and Arkansas’ electric cooperatives have benefited ever since. In the 1950s, when many of the dams were being built in Arkansas and surrounding states, the power they produced was not the least expensive electricity being produced. But the cooperatives didn’t have many alternatives, so they took it. Today, hydropower is the lowest cost power resource, especially during periods of peak electricity demand.

AECC continues to buy federal hydropower from the Southwestern Power Administration (SPA), a Tulsa, Oklahoma-based government agency that markets power from 24 federal dams. Under contract with the SPA, AECC is entitled to 189 megawatts of power annually. Because the power from SPA is available for a limited number of hours during the year, AECC uses most of it during its peak demand for power.

AECC Eyes the Arkansas River

While the U.S. Army Corps of Engineers constructed major dams on the Arkansas River through the McClellan-Kerr Arkansas River Navigation Project, hydropower wasn’t a top priority and several were built without powerhouses. At a 1999 ceremony commemorating the completion of AECC’s third hydropower plant on the Arkansas River, Dale Bumpers told attendees that when he joined the Senate in 1975, he wanted to build hydropower plants on every dam on the Arkansas River. But he said he quickly discovered that there was no support from the federal government to build new hydropower plants, and the private sector was also disinterested. That’s because the investment wouldn’t provide a quick payback, but would for the long term. Bumpers added that he was elated when AECC applied in 1978 for federal licenses to build the plants.

The Corps did build powerhouses at 5 Arkansas River dams that had the greatest potential for hydropower generation. But, because energy was cheap at the time, the government decided it wasn’t worth the investment to put hydropower plants at the other locks and dams.

However, in the late 1970s, power costs were again on the rise and AECC began looking for ways to lower those costs. That’s when the cooperatives turned to the Arkansas River. It was not a decision that was made easily. Before construction began, AECC conducted feasibility studies and went through a lengthy process to obtain the federal licenses for the hydropower plants. The first plant, the Clyde T. Ellis Hydroelectric Generating Station, began operation in 1988 with an installed capacity of 32.4 megawatts and cost about $75 million to build.

Five years later, the Carl S. Whillock Hydroelectric Generating Station at the Arthur V. Ormond Lock and Dam near Morrilton was completed at a cost of $80 million. Its installed generating capacity is 32.4 megawatts.

The cooperatives began work on their third hydropower plant in 1994. This plant, located at the Wilbur D. Mills Dam near Dumas, was completed in 1999 at a cost of about $189 million. In 1999, cooperative leaders and dignitaries celebrated the construction of the plant, known as the Electric Cooperatives of Arkansas Hydropower Generating Station. It has an installed generating capacity of 102.6 megawatts.

Run of the River

Graphic showing a generating station and lock and dam on a riverAECC’s hydropower plants are low-head, run-of-river plants. Run-of-the-river plants use the available water flowing downriver to generate electricity without ponding water or changing the rate of flow from what the Corps of Engineers would normally release. They are low-head plants, meaning that they operate at dams where the “head,” which is the difference between water levels on the upstream and downstream sides of the dam, is typically around 20 feet or less. The power plants at the dams on the White River, for example, are high-head plants with heads measuring 100 feet or more.

For the Long Run

With 20 years under its belt, the Ellis plant is going strong, as are the others. The hydroelectric plants have estimated lifespans of 100 years, which means the cooperatives have a long-term resource that will only increase in value as fuel costs for other sources of generation, such as natural gas-based power, continue to climb. Hydroelectric provides low-cost power and will benefit Arkansas’ electric cooperatives for generations to come.


Solar

Solar generation facility with many solar panelsAECC has long-term power purchase agreements for up to 27 megawatts of solar energy. The energy is provided through solar projects located throughout Arkansas.

However, the largest source is a 12-megawatt (AC) array located in the Highland Industrial Park in East Camden, which is owned and operated by Silicon Ranch Corp. Aerojet Rocketdyne purchases the solar power for its 1,200-acre East Camden facility that was completed in late 2015 and is capable of generating enough electricity to power the equivalent of 2,400 single-family homes. Excess solar energy is released to AECC and dispatched to the wholesale power market.


Wind

AECC has long-term power purchase agreements for approximately 474 megawatts of wind energy.

AECC is committed to adding resources like wind to its diverse generation portfolio to help to stabilize energy prices for cooperative member-owners. The wind facility along with AECC’s three existing run-of-the-river hydroelectric generating stations continues the cooperative’s long-standing commitment to a diverse, reliable generation portfolio that provides energy at the lowest possible cost.


REC Disclaimer

AECC currently sells or plans to sell the Renewable Energy Credits associated with the electricity produced by the following: Clyde T. Ellis Hydroelectric Generating Station, Carl S. Whillock Hydroelectric Generating Station, Electric Cooperatives of Arkansas Hydropower Generating Station and from facilities associated with power purchase agreements with Origin Wind Energy, Drift Sand Wind Project, Flat Ridge 2 Wind Energy, Chisholm View II Wind Project, Wildhorse Wind and SR Camden. AECC does not claim that the electricity sold from these generation resources to its member cooperatives and others is “green,” “renewable,” “clean” or has any other environmental attribute.